cement and steel permissible westage

allowable wastage cement sand

The permissible wastage for cement is 1%.For bricks 2.5%,For tiles, actually depends on the pattern laid but taken 3-4% in general and for steel it is 3%. Is code for allowable cement wastage - …

contact us

allowable wastages for all construction materials

WHAT IS THE %WASTAGES OF CEMENT BRICKTILES STEELIN 1 M310M21 TON RESPECTIVELY Answer / dushyant bansal The Permissible wastage for cement is 3% for bricks it is 2.5 % and for tiles it depends on the floor shape and size which can. ISO 9001:2008 Certified Volume 2 Issue 1 July 2012 Waste … & 0183;& 32;construction cost of which cement and ...

contact us

QUANTIFICATION OF CONSTRUCTION MATERIAL WASTE …

materials in building projects are cement, rubble, steel, timber, aluminium and so on. The standard deviations of rubble, steel, timber and cement are relatively high indicating inconsistency in use. Based on these results only 11 materials were selected for material reconciliation. Materials related to Building Services were ignored due to non ...

contact us

CPWD 6

Variations permissible on theoretical quantities. a) Cement for works with estimated cost 3% plus / minus. put to tender not more than Rs. 5 lakhs. for works with estimate cost put to . tender more than Rs. 5 lakhs. 2% Plus/Minus. b) Bitumen for all works. 2.5% plus only & nil on minus side. c) Steel Reinforcement and structural steel 2% plus ...

contact us

How much steel is required for 1000 sqft roof slab ...

how we calculate quantity of cement, sand, Steel bar and aggregate required,you know that for the casting of roof slab we used M20 mix concrete. Steel required for 350 sq ft slab Steel bar calculation :- In roof slab reinforcement we provide there is a two types of Steel bar used main bar and cross bar.

contact us

Interview Questions Answers in Civil Engineering ...

WHAT IS THE %WASTAGES OF CEMENT, BRICK,TILES, STEEL,IN 1 M3,10M2,1 TON RESPECTIVELY. Answer. The Permissible wastage for cement is 3%, for bricks it is 2.5 % and for tiles it depends on the floor shape and size which can be permitted upto 6%, while wastage is steel …

contact us

STRAIN HARDENING OF REINFORCEMENT IN CONCRETE …

characteristics of steel reinforcement in a concrete moment resisting frame (CMRF) and the overall seismic performance of the building similarly involves considerable complexity. NEW ZEALAND REINFORCING The types of reinforcing steel that can be used in New Zealand are governed by a joint Australian/New Zealand Standard, AS/NZS 4671:2001.

contact us

IS 457 (1957): Code of Practice for General Construction ...

2.1 Cement Factor - The weight of cement in kg per cubic metre ( or lb per 100 cu ft ) of concrete after compaction. 2.2 Concrete -A mixture of Portland cement, water, fine and coarse aggregates ( and any admixture approved by the engineer-in-charge) mixed and p~acccl in accordance with the code.

contact us

How to calculate wastage factor in steel reinforcement ...

 · Brij Bhushan Agarwal: 1.What is the actual wastage for the reinforcement steel and for str. steel. 2. While cutting of full length bar according to the drag. and the wastage of bar goes beyond the permissible limit due to non standard length of bar what should be done to minimise the wastage. Posted: 1006 days ago

contact us

Reinforced Concrete Design

transformation coefficient for steel to concrete n.a. = shorthand for neutral axis (N.A.) pH = chemical alkalinity P = name for load or axial force vector A sc f cc f sc A b A c l dh. ARCH 631 Note Set 10.1 F2013abn 2 P o = maximum axial force with no concurrent bending moment in a

contact us

Cement Kilns: Design features of rotary kilns

Design features of rotary cement kilns. The shell of the kiln is made of mild steel plate. Mild steel is the only viable material for the purpose, but presents the problem that the maximum temperature of the feed inside the kiln is over 1400°C, while the gas temperatures reach 1900°C.

contact us

Guide to tolerances, materials and workmanship in new ...

2 GUIDANCE – GUIDE TO TOLERANCES, MATERIALS AND WORKMANSHIP IN NEW RESIDENTIAL CONSTRUCTION 2015 DOCUMENT STATUS THIS DOCUMENT''S STATUS ISBN 978-0-478-43380-7 (Online) Published May 2015 Ministry of Business, Innovation and Employment PO Box 10-729, Wellington, New Zealand.

contact us

4 221 a

the cement consumed above 5% shall be recovered at an enhanced rate of 2 times the issue rate or 1.5 times the prevailing market rate. b)TMT CRS Reinforcement steel Maximum wastage Permitted will be 5% of the theoretical consumption. If the wastage is more than 5% of the steel billed for, then the excess wastage above 5% of the steel billed for,

contact us

1.0 what is the permissible westage of steel in structural ...

1.0 what is the permissible westage of steel in structural steel fabrication say gantry, trustle of.. Answer / maria alphonse pandian steel 1% and cement 3% is permissable.But this is variable as per site tender documents by individual companies.

contact us

Allowable wastage for ready mix concrete?

What is mean concrete class c35/20. Here C35 and 20 means? 10 Answers How to calculate carrying capacity of the existing water supply trunkmain . 0 Answers what is the difference of 53 & 43 grade cement ? expailn . 8 Answers Gujarat Alkalies ...

contact us

Flexural Strength of Concrete Using Tor Steel ...

 · The experimental study herein is intended to ascertain behavior of torque steel reinforcement fibers (TSRF) in flexural for use in M20 grade of concrete. Improvement in flexural strength and reduction in wastage can be assessed effectively by the study of torque steel reinforced fibers. The testing program involves 27 concrete beam specimens ...

contact us

How to Control Reinforcement Steel Wastage at Construction ...

 · We accept Reinforcement steel as per below Tolerance limits specified by us and you are bound to supply material as per this only. For up to and including 10mm Dia bar – (-)7% and +2%. For Over 10mm up to and including 16mm Dia Bar – (-)5% and +2%. For above 16mm Dia bar – …

contact us

Allowable Wastage Of Construction Materials

Cement: 2% to 3.5%: Due to the fineness of cement, it may fly away by air when cement mixes with the other ingredients. Sand: 8% to 12%: The sand is sieved for plastering work and other finishing works. So some coarser sand will be neglected while sieving and some particles are dropped off during transportation. Coarse Aggregates: 5% to 8%

contact us

Types and Causes of Concrete Deterioration

Corrosion of reinforcing steel and other embedded metals is the leading cause of deterioration in concrete. When steel corrodes, the resulting rust occupies a greater volume than the steel. This expan-sion creates tensile stresses in the concrete, which can eventually cause cracking, delamination, and spalling (Figs. 1 and 2).

contact us

standard wastage in construction materials

Corroded steel is not used for construction purposes. The below mentioned percentages are ideal. As mentioned above it may vary with so many factors. Standard wastage of construction materials:-1) Cement -1% 2) Reinforcement Steel – 3% 3) Structural Steel -10% wastage in plats and 5%wastage in other steel section.

contact us

allowable wastage of construction materials as per is code

Terms Conditions for free issue of cement Steel. 1112 CEMENT WASTAGE 11121 Allowable wastage One and half percent 15 of theoretical consumption of cement 11122 For any material issued by BHEL to the contractor free of cost and which is not accounted for by the contractor to BHEL then recovery for such material shall be effected at penal rates ...

contact us

allowable wastage of construction materials as per is code

what is westage for steel concrete tiles pains as per. Wastage depends on type sizes of the concrete structural members and how much efforts are giving towards reducing the wastage of the construction materials at site. Groups H1 H2 H3 H4 and H5 UpCodes.

contact us

Allowable Wastage Of Construction Materials | LCETED ...

 · Reinforcement Steel. 4.5% to 6%. Cutting and bending process of steel for reinforcement causes steel wastages, NOTE: Steel wastages can be used by many ways. When the steel length is below 1000mm, then it is considered as wastage. Structural Steel. 12% to 15%. Structural wastes occur on fabrication work like cutting and bending steel plate or ...

contact us

IS 2571 (1970): Code of practice for laying in-situ cement ...

4.1 Cement - Cement used for the floor finish work shall conform to IS: 269-1967* or to IS : 455-1967t or IS : 1489-1967$. 4.2 Aggregates 4.2.1 Aggregates for cement concrete flooring mix shall conform to the requirements of IS : 383-19635. The aggregate crushing value, when

contact us

What Is Reinforced Cement Concrete? Origin & Advantages

Reinforced cement concrete is the composite of concrete and steel reinforcement that can resist different types of load such as compressive, tensile, and shear force. RCC having functional resistant capacity against fire. Purpose of Reinforcement in Concrete

contact us

(PDF) Shear Strength and Moment-Shear Interaction in Steel ...

Shear Strength and Moment-Shear Interaction in Steel-Concrete Composite Beams. Journal of Structural Engineering, 2014. Brian Uy. George Vasdravellis. Brian Uy. George Vasdravellis. Download PDF. Download Full PDF Package. This paper. A short summary of …

contact us

Construction Materials Allowable Wastage Percentages

Steel Materials: Allowable wastage for steel works is 3 %( i.e. cutting/bending wastage). For reconciliation purpose, + or -2% allowable for rolling margin in this accounts. Above 25mm dia of rods 5% wastage should be considered. Concrete Materials: Concrete pouring or placing time & during loading, transportation lot of concrete it will be waste.

contact us

OSHA Interpretation: Whether a multiple lift of pre-cast ...

As we noted in our August 23, 2005 letter to Mr. Leadbetter, the steel erection standard does not apply to the erection of pre-cast concrete members. 1 Instead, 1926 Subpart Q, Concrete and Masonry Construction, applies to an employer engaged in pre-cast erection work. The cranes and s requirements in 1926 Subpart N also apply to ...

contact us

Mechanical Properties of Concrete and Steel

Mechanical Properties of Concrete and Steel Reinforced Concrete (RC, also called RCC for Reinforced Cement Concrete) is a widely used construction material in many parts the world. Due to the ready availability of its constituent materials, the strength and economy it provides and the flexibility of its forms, RC is often preferred to steel ...

contact us

Presentation On "MATERIAL MANAGEMENT

CEMENT STEEL BRICK AGGREGATE SAND ) MATERIAL Wastage Chart Project-2 . Case study Analysis Sr.No Name of Material Actual wastage Allowable wastage Avg. wastage Project 1 Project 2 1 Cement 1.73% 0.88% 2% 1.30% 2 Steel 4.59% 2.12% 5% 3.35% 3 Brick 2.39% 6.46% 5% 4.42% 4 Course Agg. 5.38% 3.60% 5% 4.49% ...

contact us

Permissible loads of a single anchor in non-cracked normal ...

Hammerset anchor EA II galvanised / corrosion resistant steel A4 Highest permissible loads for a single anchor1)6) for multiple use for non-structural applications in cracked and non-cracked concrete C20/25 up to C50/605). Type Effective anchorage depth thickness Min. member Maximum torque moment Permissible load Required spacing for Min ...

contact us

ISO 9001:2008 Certified Volume 2, Issue 1, July 2012 Waste ...

concrete and for reinforcement steel were rated based on a Questionnaire Survey. The different methods are, placing the concrete to required point using: i) pump ii) buckets & iii) using chutes made of GI sheets, such that the concrete directly flows into the required place. One can see the wastage being different for each of the methods. 1.

contact us

allowable wastage of civil material

Steel Materials: Allowable wastage for steel works is 3 %( i.e. cutting/bending wastage). For reconciliation purpose, + or -2% allowable for rolling margin in this accounts. Above 25mm dia of rods 5% wastage should be considered. Concrete Materials: Concrete pouring or placing time & during loading, transportation lot of concrete it will be waste.

contact us

WHAT IS THE %WASTAGES OF CEMENT, BRICK,TILES, STEEL,IN 1 ...

WHAT IS THE %WASTAGES OF CEMENT, BRICK,TILES, STEEL,IN 1 M3,10M2,1 TON RESPECTIVELY.. Answer / dushyant bansal. The Permissible wastage for cement is 3%, for bricks it is. 2.5 % and for tiles it depends on the floor shape and size. which can be permitted upto 6%, while wastage is steel is.

contact us

allowable wastage of construction materials as per is code

Materials. 2. Masonry. 3. Reinforced Concrete Construction. 4. Prestressed Concrete. 5. Plastering ..... laboratory tests are carried out as per relevant IS codes as mentioned in table no. 6.1. Table 6.1 ..... Tables of permissible tensile stresses of ferrocement f...

contact us

Waste Heat Recovery System

2.1. The first step in planning to install a waste heat recovery system (WHRS) is to work out the net available waste heat that can be used to generate power. 2.1.1. In a cement plant, waste heat is available mainly from kiln exhaust gases and vent air from the clinker cooler.

contact us

Permissible wastage limit of tiles

Permissible wastage limit of tiles Products. As a leading global manufacturer of crushing, grinding and mining equipments, we offer advanced, reasonable solutions for any size-reduction requirements including, Permissible wastage limit of tiles, quarry, aggregate, and different kinds of minerals.

contact us

Is there an I.S. code available for allowable wastage of ...

For Indian standard mode measurement IS: 1200, It has been categorized for excavation, PCC, RCC,etc…, In that, wastages % is not detailed. during condition of contract while taking the order. it has been mentioned or mutually agreed between contra...

contact us

What are the Tolerance Limits on Construction Site ...

Maximum freefall of concrete = 1.50 m height. Tolerance on diameter in length 0-25mm = +- 0.5 % 25-35mm = +- 0.6 % 35-50mm = +- 0.8 % ... While passing purchase invoice of Reinforcement & structural steel, how much tolerance is allowed between supplier''s weight & My weight. some times supplier does not provide loading point weight slip with ...

contact us

Blended Cement

Blended Cement. Blended cements are produced by inter-grinding Portland cement clinker (Clinker is the main product of Portland cement manufacture and is generated by heating raw materials (limestone, iron ore, and alumino-silicates such as clay) together at temperatures of about 1400–1500°C.) with supplementary cementitious materials (SCMs) or by blending Portland cement with SCMs such as ...